Work Package 1:
Life Cycle and Socio-Economic
Assessment
Leader:
University of Loughborough
Partners
COGEN Europe,
Brussels, Belgium; ECN - the Energy Research
Centre, Amsterdam, Netherlands; ISQ - Instituto
de Soldadura e Qualidade, Porto-Salvo, Portugal;
PLANET – Planungsgruppe Energie und Technik GbR,
Oldenburg, Germany; SAVIKO Consultants ApS,
Roskilde, Denmark; Technische Universität
Berlin, Germany.
Aims and Objectives
The principal aims
of Work Package 1 (WP1) are to evaluate and
present the relative environmental, social and
economic costs and benefits of transporting
hydrogen through existing natural gas networks.
The main objectives consist of conducting life
cycle assessment of the major natural resource
inputs and environmental outputs, and
socio-economic assessments of employment and
economic costs for current natural gas and
related energy systems, transitional natural
gas/hydrogen systems and future complete
hydrogen systems. In particular, such life cycle
assessment concentrates on primary energy inputs
relevant to energy resource depletion, carbon
dioxide and other prominent greenhouse gas
emissions associated with global climate change,
major emissions which affect air quality, and
ionising radiation.
Socio-economic
assessments address direct and indirect job
creation and maintenance, and internal economic
costs. A modular approach ensures that all
components of the systems under investigation
can be evaluated in a coherent, effective and
transparent manner. Comparison of the relative
costs and benefits considers current natural gas
and related energy systems (baseline scenario),
the transitional natural gas/hydrogen system
(intermediate scenario) and the future complete
hydrogen system (final scenario).
Current Status
The activities of
WP1 are divided into 8 Tasks and their current
status can be summarised as follows:
-
Task 1.1
(Literature Review) examined existing work
on relevant life cycle and socio-economic
assessment and this has been reported in
Deliverable D2 (Literature Review Report),
which is updated using an electronic
database.
-
Task 1.2
(Standard Results Format) developed a
spreadsheet template for conducting life
cycle and socio-economic assessment and this
has been provided as Deliverable D5
(Standard Spreadsheet) which is supported by
a users’ guide.
-
Tasks 1.3
(Baseline Scenario), 1.4 (Intermediate
Scenario), and 1.5 (Final Scenario) are all
underway; this involves preparing
spreadsheets for all the technologies
associated with current natural gas and
related energy systems, the transitional
natural gas/hydrogen system and a future
complete hydrogen system. This work is
expected to be completed in 2007 and the
results of these Tasks will be reported in
Deliverables D7 (Baseline Scenario Report),
D29 (Intermediate Scenario Report) and D30
(Final Scenario Report).
-
Task 1.6 will
bring the results together (Comparison of
Results) which will produce Deliverable D41
(Comparison Report) in 2008.
-
Task 1.7
(Interpretation of Results) is underway and
this will provide Deliverable D42
(Interpretation Report) in 2008.
-
Task 1.8
(Co-ordination) is ongoing and will conclude
in 2009.
|